ERCOT Large Load and Batch Zero

How ERCOT is sorting the large-load interconnection queue: Batch Zero, PGRR145, Senate Bill 6, the PUCT rules, and what it means for anyone trying to connect a data center or battery in Texas. 31 articles from The Grid Report, newest first.

Texas Transmission and the 765 kV BuildoutCoverage of the 765 kV Eastern Backbone, the STEP plan, CCN dockets, congestion, and where new wires are and are not coming in ERCOT..Data Centers and Texas CommunitiesWater, noise, tax abatements, moratoriums and local control.Powered Land and Site EconomicsWhat powered land trades for.

Barrio Energy develops powered sites in Texas and publishes the Barrio Grid map and API the reporting above draws on. Questions from communities: see Community.