Data Centers and Texas Communities

Water, noise, tax abatements, moratoriums and local control: what Texas counties and cities are doing about large loads, and what a developer owes the town it builds in. 25 articles from The Grid Report, newest first.

ERCOT Large Load and Batch ZeroHow ERCOT is sorting the large-load interconnection queue.Texas Transmission and the 765 kV BuildoutCoverage of the 765 kV Eastern Backbone, the STEP plan, CCN dockets, congestion, and where new wires are and are not coming in ERCOT..Powered Land and Site EconomicsWhat powered land trades for.

Barrio Energy develops powered sites in Texas and publishes the Barrio Grid map and API the reporting above draws on. Questions from communities: see Community.